See our work in Bilthoven
Clarity for your home

Chimney removal in the attic or upstairs

Removing a flue section in the loft can free up room for storage or a conversion. Identify what will remain above and below, and specify the floor finish needed for its future use.

More attic space, with attention to what remains above

In an attic, a flue may run diagonally or close to roof timbers. Removing an awkward corner must account for the structure and any retained roof stack. Assess it alongside plans for a bedroom, dormer or insulation, helping avoid reopening newly finished work later.

Include access and floor repairs in the plan

A narrow staircase, finished landing or limited waste-handling space affects the work. We agree a protected route and boundary on each floor. Specify how floor and ceiling openings are reinstated and which final finishes you or another contractor will complete.

A chimney through an attic or bedroom can limit your layout. We assess what can be removed and what will remain above and below. Partial removal requires particular care with the independent support of retained sections.

What do we check beforehand?

We inspect timber floors, roof members, anchors and concealed connections. Drawings and photographs help, but do not replace assessment of the actual structure.

  • Which parts are removed and retained
  • Active connections and shared use
  • Access, protection and waste route

How is your home handed back?

Floor and ceiling reinstatement are specified separately. If attic insulation or lining is also planned, the junctions can be coordinated in the same preparation.

Costs and a clear quotation

The indicative starting budget is € 1,750 including 21% VAT. An estimate is not an agreed fixed price.

Scaffolding, engineering, steelwork, asbestos assessment or removal, permits and extra finishing are assessed separately. Your quotation makes included and excluded work clear.

View costs and calculator

Include this with your enquiry

  • Address and affected floors
  • Photos from a safe location, inside and outside
  • Available drawings or existing reports
  • Preferred finish and timing

Questions about this work

Can I remove just the section in the loft?

Have the remaining masonry, connections below and roof section assessed together. The agreed plan must address any continuing use of the flue.

Will the new floor be ready to walk on?

Specify the intended use, level and finish. Closing a structural opening and matching the final floor surface are separate items.

Does a narrow loft hatch affect the estimate?

Yes. Give the hatch size and the route from the loft to the front door so access, protection and waste removal can be planned.

In your municipality too

We handle enquiries from every province. Explore your service area for local information and an enquiry.

Service areas

Room for your next chapter.

Tell us about your chimney. We will help you plan the next step.

Call usFree quote