See our work in Bilthoven
Structure

When do you need structural calculations?

If masonry will remain above the breast or the connections to walls, floors or the roof are unclear, have an engineer assess the load path before removal. The engineer determines which calculations are needed.

By Schoorsteen laten verwijderen
Updated on

Establish the load paths

A chimney may carry only its own weight or interact with floors, walls and the roof. Past alterations can obscure the arrangement. Assessment begins with available drawings, a site survey and investigation of the parts that will remain after removal.

Partial removal needs particular care

If you create space downstairs while retaining masonry above, that masonry needs permanent support. Temporary support during the works is a separate issue. The engineer determines the required design; steel and anchor sizes cannot be selected from a photograph alone.

What should you provide?

Collect plans, sections, information about previous alterations and photos of all affected floors. Clearly identify what must remain. Tell us if drawings are missing so we can discuss additional investigation.

What should I mark on the drawings?

Mark what will be removed and what will remain on every affected storey. If known, indicate any neighbour’s flue in the same masonry. Add earlier permit drawings and list later alterations. The engineer can then identify what still needs to be inspected on site.

Load-bearing chimney removal

Room for your next chapter.

Tell us about your chimney. We will help you plan the next step.

Call usFree quote