From roof to ground floor: define the boundary
“Complete” only becomes clear when every affected floor is listed. Does the flue run through a bedroom, attic or basement? Are the fireplace, chimney breast and any foundation remnants included? Drawings and photographs help define what goes and what stays, so removal fits the renovation plan.
Plan the reinstatement phase too
Removal can expose openings in floors, walls and ceilings on each storey. Structural closing differs from a painted wall or a seamlessly restored parquet floor. Agree the finish for each room, allowing for drying and follow-on trades. The programme follows assessment of structure, access and materials.
Complete removal covers the roof stack, flue and chimney breasts on the agreed floors. It needs a coordinated plan for demolition, structural support, floor openings and roof repair. We specify what is removed and how each space is handed over.
What do we check beforehand?
A structural engineer assesses load paths, bearings and retained elements where required. Hidden connections, shared flues, suspected asbestos and permits are addressed before work starts.
- Which parts are removed and retained
- Active connections and shared use
- Access, protection and waste route
How is your home handed back?
Choose a basic building finish or additional wall, ceiling and floor finishing before work starts. Plastering, decorating and matching floor finishes are included only when specified in the quotation.
Costs and a clear quotation
The indicative starting budget is € 3,500 including 21% VAT. An estimate is not an agreed fixed price.
Scaffolding, engineering, steelwork, asbestos assessment or removal, permits and extra finishing are assessed separately. Your quotation makes included and excluded work clear.
View costs and calculatorInclude this with your enquiry
- Address and affected floors
- Photos from a safe location, inside and outside
- Available drawings or existing reports
- Preferred finish and timing
Questions about this work
What does complete removal include?
Set out the roof stack, shaft and breast on each floor in the quotation. A separate flue or a neighbour’s section must be identified before the scope is agreed.
Will every room be ready to decorate?
Agree the end condition room by room. Closing a floor or ceiling opening does not include plastering, painting or matching a floor covering unless these items are listed.
What changes the indicative price?
An extra floor, restricted waste access, separate scaffolding or structural work can increase the cost. Ask for those items and any material survey to be priced separately.