Permit or demolition notification: what is needed?

Whether chimney removal needs a permit depends on the address and the proposed work. A demolition notification is assessed separately. More than 10 m³ of demolition waste requires a notification, and asbestos usually does too.

By Schoorsteen laten verwijderen
Updated on

Check the actual address

Whether removal is allowed depends on the specific address and scope. Use the Omgevingsloket permit check and check for heritage or protected-area status. An example from another property does not give permission for your renovation.

Notification and permission are separate

Dutch government guidance requires demolition notification when more than 10 m³ of waste is produced. Asbestos usually also triggers notification. A small amount of ordinary rubble does not automatically remove other checks. Establish the applicable procedure before scheduling work.

Agree who handles each step

Agree who performs the check, supplies documents and submits any application. Keep drawings, decisions and agreements with the quotation. Confirm the programme once the required approvals and technical assumptions are clear.

What should I enter in the Dutch permit check?

Use the exact address and describe whether the work affects only the roof stack, an internal breast or any load-bearing masonry. Include heritage status and works on public land where relevant. Keep the result with the drawings and check any outstanding questions with the municipality.