Start with how you want to use the space and have the building options assessed.
Discuss soot and odour beforehand
Soot may remain on internal surfaces or adjacent masonry. Opening up reveals the remaining substrate. Mention existing odour and moisture problems when enquiring.
Have the substrate assessed
Have the contractor assess cleaning or treatment before new plaster. Painting over affected areas is not always suitable. Investigate moisture too.
Coordinate treatment and finishing
Specify the intended result and discuss drying time. Odour, stains and wall flatness are separate handover considerations. Schedule decoration when the substrate is ready.
Discuss your home
Want to know how this applies to your chimney? Share the address, photographs taken safely and your desired result. We will discuss the survey, preparation and finishing needed and set out the agreed scope in a quotation.
Request a quote
