See our work in Bilthoven
Space & layout

A new kitchen where the chimney breast stood

Coordinate removal, wall repairs and kitchen measurements before ordering.

Bilthoven project photograph: chimney during removal
Our own photograph · Bilthoven project
A useful starting point

Start with how you want to use the space and have the building options assessed.

01

Start with the kitchen design

A chimney breast can interrupt continuous cabinetry. Assess what masonry can be removed and what needs support. The visible breast does not necessarily represent the entire structure behind it.

02

Check the wall and services

Plan plumbing, power and extraction separately. Do not reuse an old flue as a new exhaust without assessment. Ask the kitchen installer to specify the required connections.

03

Coordinate removal and installation

Take final measurements once the new wall position is confirmed. Agree who repairs plaster and flooring and when surfaces will be dry enough for installation.

Explore this topic further

Can you remove only the lower section?

All benefits

Discuss your home

Want to know how this applies to your chimney? Share the address, photographs taken safely and your desired result. We will discuss the survey, preparation and finishing needed and set out the agreed scope in a quotation.

Request a quote

Room for your next chapter.

Tell us about your chimney. We will help you plan the next step.

Call usFree quote