Agree preparation and the condition in which your home will be handed back.
Choose the route before work
Masonry must travel from the work area to a suitable collection point. The route may use stairs, corridors or another arrangement. Discuss narrow access before work starts.
Protect floors and doorways
Photographs of stair turns, thresholds and delicate floors help preparation. Clarify temporary storage and waste separation. Collection points need practical access.
Coordinate disposal and access
For pavement or street use, check local requirements. Keep neighbours’ and emergency access clear. Confirm whether disposal and external placement charges are included.
Discuss your home
Want to know how this applies to your chimney? Share the address, photographs taken safely and your desired result. We will discuss the survey, preparation and finishing needed and set out the agreed scope in a quotation.